InspectionReport Logo
InspectionReport
TemplatesChecklistsPricing
Built in Estonia
Sign InBuild a report
Build a report
Free sample · No sign-up

See what your site photos can become.

Review the source photos, AI-drafted findings, and the complete 20-page inspection report with corrective actions and site map. The sample is free to open and download.

Open the full sample PDFBuild my report free
Realistic sample photos Editable findings workflow A4 report layout

Sample output

Construction Site Safety Inspection

20 pages
Materials blocking a marked emergency exit
Blocked fire exit
Damaged electrical cable with exposed wiring
Exposed wiring
Open elevated edge without a complete guardrail
Missing guardrail
Oil spill creating a slip hazard on a workshop floor
Oil spill

Try it without signing up

Edit a sample finding yourself

Type into either field below and watch how the wording reads in the report — before you ever create one of your own.

Prepared example — not a live report

This finding is pre-drafted from the sample evidence. Try editing the wording and watch the preview change. This does not run AI generation.

Edits stay in this demo. No real report is created or saved.

Materials blocking a marked emergency exit

Evidence photo

Blocked fire exit

Example evidence linked to this finding.

Example field note: Main warehouse — pallets and boxes blocking the fire exit. Clear immediately.

How it reads in your report

Critical

Blocked fire exit

Main warehouse · location from example field note

Observation

Wooden pallets, cardboard boxes and other stored materials obstruct the marked fire exit. The obstruction could prevent people from using this exit in an emergency.

Corrective action

Clear the stored materials immediately and keep the escape route unobstructed. Check the required escape-route width against the site fire-safety arrangements.

How it works

From messy field notes to a professional report

You type or dictate the way you normally would on site — abbreviations, typos, stray thoughts. The AI reads between the lines, structures the findings, assigns severity, and writes the corrective actions. You stay in control: review and adjust before export.

What you type on site

11:15 warehose east side

fire exit completly blocked. pallats and cardbord boxes stacked up to the ceiling almost. sign says "do not block" right above it lol. need to clear this today - big safety risk if fire breaks out. also all that wood is basicaly kindling right next to the exit.

talked to shift supervisor he said "we'll get to it next week" - not good enougth

Typos, shorthand, incomplete — exactly as entered
What the report delivers
Critical
01

Blocked Fire Exit — Main Warehouse

Observation

The designated fire exit on the east wall of the main warehouse is completely obstructed by stacked wooden pallets, cardboard boxes, and loose debris. The obstruction extends from floor level to approximately 2 metres in height. A FIRE EXIT — DO NOT BLOCK sign is clearly visible above the blocked doorway.

Corrective Action

Immediately clear all materials from the fire exit pathway. Relocate stored materials to designated racking in Warehouse Bay C. Paint high-visibility yellow hatching on the floor in front of all fire exits. Institute a daily pre-start inspection of all egress routes.

Regulatory Reference

AFS 2020:1 §54 (Emergency exits); NFPA 101 §7 (Means of Egress)

AI-structured from your raw notes
What you type on site

plant room B - holy shit

the cover is GONE from the big electrical panel. DB-04 i think? can see all the wires - red blue yellow ones just hanging there. anyone could walk in and touch 400v no warning signs no lock nothing. told the electrician on site and he just shrugged. this is really really bad.

 

also thers an extension cord in the production area thats frayed to hell. copper showing. someone put a danger tag on it but its still plugged in?? like what are we even doing here

Typos, shorthand, incomplete — exactly as entered
What the report delivers
Critical
02

Exposed Live Electrical Conductors — Distribution Board DB-04

Observation

The front cover of distribution board DB-04 in Plant Room B is missing entirely, exposing live 400V three-phase conductors. Several conductors are partially disconnected and hanging loose within the enclosure. The board is not locked out, no warning signage is present, and access to Plant Room B is unrestricted.

Corrective Action

Immediately de-energise DB-04 and apply Lockout/Tagout. Install a replacement cover panel compliant with IEC 61439. Engage a qualified electrician to inspect all terminations before re-energisation.

Regulatory Reference

AFS 2006:1 §7 (Electrical installations); SS-EN 61439; ELSÄK-FS 2022:1

AI-structured from your raw notes
What you type on site

walking around production floor

cables everywhere on the ground!! orange extension cords crossing the main walkway in like 3 places. people just steping over them. if theres a fire and smoke fills the place someone is gonna trip and then everyone piles up behind them. this is the main exit route ffs.

 

also noticed oil spill in the workshop bay. big one. maybe 3-4 litres of hydraulic oil just sitting there. no onecleaned it no sign nothing. floor is slippery as hell. whats that going into the drain??

Typos, shorthand, incomplete — exactly as entered
What the report delivers
Potentially Serious
03

Trip Hazard — Electrical Cables Across Emergency Exit Route

Observation

Multiple electrical cables are running across the main pedestrian walkway on the production floor with no cable protection. The walkway is a designated emergency exit route. Three cable crossings were observed within a 15-metre section. In an emergency with reduced visibility, these cables present a serious entanglement and trip hazard.

Corrective Action

Immediately secure all cables using heavy-duty cable ramps rated for pedestrian traffic. Install overhead cable trays as a long-term solution. Mark the pedestrian route with high-visibility floor tape.

Regulatory Reference

AFS 2023:4 §32 (Traffic routes); AFS 2020:1 §55 (Emergency routes)

AI-structured from your raw notes
Review every finding before export — you have the final say

From evidence to action

A report people can act on

InspectionReport groups the evidence into structured findings. You remain in control: review the wording, severity, location, and corrective action before export.

Critical01

Blocked fire exit

Main warehouse

Corrective action

Clear the exit route immediately and keep the required escape-route width unobstructed.

Critical02

Exposed electrical wiring

Plant room B

Corrective action

Isolate the circuit and install a secure, rated junction-box cover.

Action required03

Oil spill on workshop floor

Workshop

Corrective action

Contain and clean the spill, then service the source of the leak.

Keep the complete sample

Download the 20-page PDF with photos, corrective actions, and site map. No email gate, account, watermark, or payment. Your own finished report unlocks both PDF + Word for €9.95, including taxes worldwide.

Download free PDF

Regulatory references

AFS, EN, ISO standards cited per finding.

Action summary + site map

Colour-coded table and marked floorplan.

PDF + Word export

Share-ready with embedded photos.

InspectionReport

AI-assisted inspection reporting tools for working inspectors.

Product

  • All Templates
  • Safety Checklists
  • Hazard Identifier
  • Pricing
  • Compare
  • SafetyCulture alternative

Popular

  • Forklift Inspection
  • MEWP Checklist
  • Fire Safety
  • Scaffolding

Resources

  • Safety Blog
  • Inspection report software
  • Daily Safety Guides
  • OSHA Compliance
  • Inspection Report App

Legal

  • Terms of Service
  • Privacy Policy
  • Refund Policy
  • Security

© 2026 InspectionReport by Estads OÜ.